In plain words
North Carolina now has a statewide ADU law, but it only reaches larger cities. An ADU, or accessory dwelling unit, is a small second home on the same lot as a house. It can be attached to the house or stand on its own in the yard. Zoning is the local rulebook for what can be built where. A 2026 law covers cities and towns with at least 50,000 people. They must allow one ADU next to each single-family home in residential zones. Cities in the 20 coastal counties are left out. So are smaller towns and land outside city limits. The rule starts January 15, 2027. Covered cities have until July 1, 2027 to update their codes, or ADUs are allowed there without limits. In covered cities, the city cannot demand extra parking. It cannot charge more than it would for a similar house permit. It also cannot stop you from renting both homes to long-term tenants. So you do not have to live on site. The city can still cap the ADU's size somewhere between 800 and 1,000 square feet. It can ask that the ADU sit beside or behind the house. It can require a setback of up to 10 feet. A setback is the open space required between a building and the property line. The law skips historic districts and HOA or deed rules. It also skips units without water and sewer or well and septic. A separate law ends minimum parking counts in most of the state in 2027. Everywhere else, your town or county still decides. You can build only if local rules and your property allow it.
The rules at a glance
| State ADU law | Yes |
|---|---|
| Where the state rule applies | Cities and towns with 50,000 or more residents that are not in the 20 coastal-area counties defined under G.S. 113A-103. Smaller towns and unincorporated county land are not covered by the ADU mandate. The separate parking-minimum ban (S.L. 2026-39) covers all local governments outside the coastal area. |
| Approved without a hearing? | Partly. Some ADUs or some places get staff approval; others can still need a hearing. |
| Kinds of ADU the state protects | attached, detached |
| ADUs per lot | At least 1 ADU per single-family detached home in covered cities (cities may allow more) |
| Owner living on site | Towns can’t require the owner to live on the property. |
| Parking | Covered cities may not set minimum parking requirements or other parking restrictions for an ADU, including when an existing building is converted. From January 1, 2027, no local government outside the coastal area may require a minimum number of off-street parking spaces for any development or structure, regardless of use. The UNC School of Government reads that rule as covering every development type, so it should reach ADUs in smaller towns and counties too; the statute's wording ('off-street parking lot') has not yet been tested against a single home's driveway. |
| Size | Covered cities must set any maximum ADU size between 800 and 1,000 square feet, and may require the ADU to be smaller than the main house (the law's definition already requires less total square footage than the main house). Statewide, G.S. 160D-702(c)(1) bars local rules that set a minimum square footage for buildings under the NC Residential Code. |
| Lot size and setbacks | Covered cities may require a setback of 10 feet or the zone's normal setback, whichever is less, and may require the ADU to sit beside or behind the house. No lot-size rule is set by the state. Once an ADU is permitted, the parcel cannot be split so the ADU ends up on a separate lot. |
| Fees | Covered cities may not charge ADU fees higher than those for permitting a similar single-family detached home. Statewide, temporary health care structure permits are capped at $100 plus $50 per year to renew. |
| Short-term rentals | State law doesn’t set this. Cities set short-term rental rules within other state limits; Asheville, for example, bars vacation rentals and homestays in ADUs made under its January 2026 rule for converting older accessory buildings. |
| Can towns opt out? | No |
What to do next
- Find out whether your property is inside the limits of a city or town with 50,000+ people and outside the 20 coastal-area counties; your county GIS map or city planning office can confirm.
- Read your deed and any HOA covenants; the state ADU law does not override private restrictions that ban second units.
- Ask your city or county planning department for its current ADU rules, and if your city is covered, ask how and when it will update its code before July 1, 2027.
- Confirm utility capacity: ask your water and sewer provider, or your county health department if you are on a well or septic system, whether the property can serve a second unit.
- If your home is in a local historic district, start with the historic preservation commission, since the state mandate does not apply there.
- Work with a designer or builder who knows the NC Residential Code, and get permits before any work starts.
What your town still decides
North Carolina cities and counties regulate land use under G.S. Chapter 160D. Outside the covered cities, each town or county still decides whether ADUs are allowed, in which zones, at what size, and whether the owner must live on site. A few statewide rules apply everywhere: temporary health care structures (G.S. 160D-915), no minimum building size for houses under the Residential Code, and, from 2027, no minimum parking counts outside the coast. The new ADU mandate does not override private covenants or HOA rules, and it does not apply in local historic preservation districts, at National Historic Landmarks, or to units without water and sewer or well and septic. A covered city whose code already meets the law does not need to re-adopt. There are no state ADU grant or loan programs; Charlotte and Durham have run city-funded affordable-ADU loan programs, both now closed to new applicants.
Examples of local rules
- Charlotte: The Unified Development Ordinance allows one ADU per lot alongside a single-family home or a duplex that is not on a sublot. The ADU must stay under the same ownership as the main home, and owners may rent it. The city's Queen City ADU forgivable-loan program (up to $80,000 for affordable rentals) stopped taking applications on October 31, 2025. Source
- Raleigh: ADUs can be detached, attached, internal, over a garage or in a basement. Generally one per lot; two are allowed only on parcels in a Frequent Transit Area. Detached ADUs follow the new single-family home permit process, and the city offers pre-reviewed 'Fast Track' plans at low cost. Source
- Durham: UDO Sec. 5.4.2 allows one ADU on a residential lot with one or two main units, up to 1,000 square feet on one floor and 1,200 square feet total. No parking is required and the code sets no owner-occupancy rule. ADUs are not allowed in flood hazard areas. The city's 2% affordable-ADU loan pilot is fully committed and closed. Source
- Asheville: One ADU is usually allowed on a residential lot with a single-family home. Size is capped at 800 square feet on lots under one acre and 1,200 square feet on lots of one to three acres. In January 2026 the council let owners convert older accessory buildings that sit too close to the property line without a variance; ADUs created that way cannot be used as short-term vacation rentals or homestays. Source
What we’re still confirming
- Which cities have 50,000 or more people under the law depends on which population count the state uses; ask your city whether it's covered.
- The law bars requiring a rezoning for an ADU, but whether a covered city can still require a special use permit with a hearing hasn't been tested.
Laws, bills and citations
The laws behind this (3)
- Allow construction and siting of accessory dwelling units (S.L. 2026-59 (SB 445, Regulatory Reform Act of 2026), Section 44; new G.S. 160D-917, signed August 11, 2026, in effect January 15, 2027). Cities and towns of 50,000 or more people outside the 20 coastal-area counties must allow at least one ADU, attached or detached, for each single-family detached home in areas zoned for those homes. Covered cities cannot ban long-term renting of both units, require conditional zoning, require parking, block hookups to the main home's utilities when capacity exists, charge more than for a similar house permit, or set a size cap below 800 or above 1,000 square feet. Cities must adopt implementing rules by July 1, 2027; if they do not, ADUs are allowed there without limits. Read it
- Parking Lot Reform / Stormwater Control (statewide parking-minimum ban) (S.L. 2026-39 (HB 162), Section 1; G.S. 160D-702(c)(2a), signed July 6, 2026, in effect January 1, 2027). Not an ADU law by name, but it reaches ADUs. Starting January 1, 2027, local governments outside the coastal area may not make an off-street parking lot meet a minimum number of spaces for any development or structure, whatever its use. Coastal-area governments keep that power except for certain historic properties. Read it
- Temporary health care structures ('granny pods') (G.S. 160D-915 (first enacted by S.L. 2014-94 as G.S. 153A-341.3 and 160A-383.5; recodified by S.L. 2019-111; amended through S.L. 2023-108), signed August 1, 2014, in effect October 1, 2014). Statewide, every local government must treat one small, factory-built temporary unit (up to 300 square feet, no permanent foundation) as a permitted accessory use in single-family zones when a close relative or guardian uses it to care for an impaired person who needs help with daily living, as certified by a doctor. Permit fees are capped at $100 plus $50 a year, and the unit must be removed within 60 days after the care need ends. Read it
Proposed and failed bills (6). None of these is law.
- H627 (2025-2026): in committee as of October 3, 2026. Would have required every local government, not just big cities, to allow one ADU per single-family home, with no parking minimums and no size cap under 800 square feet. It cleared three House committees between April 17 and May 6, 2025, then was pulled from the House calendar on May 7, 2025, and sent back to the Rules committee. The 2026 adjournment resolution (Res. 2026-6) bars ordinary bills in the remaining reconvened sessions, so it cannot advance and ends when the session closes on December 18, 2026. Bill page
- S495 (2025-2026): in committee as of October 3, 2026. Senate twin of H627. Referred to Senate Rules on March 26, 2025, with no action since. Blocked from further action by the 2026 adjournment resolution. Bill page
- H765 Save the American Dream Act (2025-2026): in committee as of October 3, 2026. A broad zoning bill. One section would have required cities of 125,000 or more to allow an ADU with every larger single-family home, with no owner-occupancy rule, no parking minimums, ordinary permit fees and setbacks of no more than 5 feet. Last action May 6, 2025, when it was sent to the Finance committee. Bill page
- H1212 HOA Accessory Limitation Ban (2025-2026): in committee as of October 3, 2026. Filed April 30, 2026. Would stop homeowners associations from limiting ADUs that meet building and environmental codes and are allowed by zoning, along with gardens and solar panels. Referred to House Rules on May 5, 2026. Bill page
- H409 (2023-2024): died as of October 3, 2026. Would have required all local governments to allow one ADU per single-family home. Passed the House 106-7 on April 25, 2023, then sat in Senate Rules until the session ended. Bill page
- S374 (2023-2024): died as of October 3, 2026. Senate twin of H409. Referred to Senate Rules on March 28, 2023, and never moved. Bill page
Sources
- S.L. 2026-59 (SB 445, Regulatory Reform Act of 2026), Section 44; new G.S. 160D-917 · official source
- S.L. 2026-39 (HB 162), Section 1; G.S. 160D-702(c)(2a) · official source
- G.S. 160D-915 (first enacted by S.L. 2014-94 as G.S. 153A-341.3 and 160A-383.5; recodified by S.L. 2019-111; amended through S.L. 2023-108) · official source
- Senate Bill 445 (2025-2026) bill history · official source · checked 2026-10-03
- NCGA staff summary of SB 445 conference committee substitute (July 29, 2026) · official source · checked 2026-10-03
- House Bill 162 (2025-2026) bill history · official source · checked 2026-10-03
- Session Law 2014-94 (temporary health care structures; approved Aug. 1, 2014, effective Oct. 1, 2014) · official source · checked 2026-10-03
- G.S. 113A-103 definition of coastal area (20 counties) · official source · checked 2026-10-03
- Resolution 2026-6 (SJR 1091), 2026 adjournment resolution limiting reconvened sessions · official source · checked 2026-10-03
- House Bill 627 (2025-2026) bill history · official source · checked 2026-10-03
- Senate Bill 495 (2025-2026) bill history · official source · checked 2026-10-03
- House Bill 765 (2025-2026) bill history · official source · checked 2026-10-03
- House Bill 765, edition 3 text · official source · checked 2026-10-03
- House Bill 1212 (2025-2026) bill history · official source · checked 2026-10-03
- House Bill 409 (2023-2024) bill history · official source · checked 2026-10-03
- Senate Bill 374 (2023-2024) bill history · official source · checked 2026-10-03
- City of Charlotte, Accessory Dwelling Units · official source · checked 2026-10-03
- City of Raleigh, Building an Accessory Dwelling Unit · official source · checked 2026-10-03
- Durham UDO Sec. 5.4 Accessory Uses and Structures · official source · checked 2026-10-03
- City of Durham, ADU Pilot Program · official source · checked 2026-10-03
- City of Asheville, Accessory Dwelling Units · official source · checked 2026-10-03
- BPR News, Asheville eases rules on accessory dwelling units (Jan. 28, 2026) · checked 2026-10-03
- UNC School of Government, Limits on Local Parking Minimums · checked 2026-10-03
- Carolina Journal, NC bill would expand ADUs, residential redevelopment (June 9, 2026) · checked 2026-10-03
- UNC SOG Legislative Reporting Service, H 627 summary · checked 2026-10-03
- UNC SOG Legislative Reporting Service, H 1212 summary · checked 2026-10-03
This is general information, not legal advice. Your town, village, city or county decides what can be built on your property. If something here looks out of date, email the team.